OUR PROJECTS

GMA SOIL & WATER

150 Tonnes of Fire Damage Waste

150 Tonnes of Fire Damage Waste

150 Tonnes ofFire Damage Waste Asbestos RemovalWe were called about 150t of fire damaged waste containing friable asbestos.The Challenges We worked closely with the Department of Environment, Land, Water and Planning to find the best solution for both the client and...

Development: Soil Screening

Development: Soil Screening

Altun Development Soil ScreeningAltun purchased a historical landfill to remediate and develop. The site was EPA audited and GMA were engaged to undertake soil screening of 10,000m3 ACM soil. GMA screened and obtained clearance on the minus 20mm, then arranged for...

Yarraville: Soil Remediation

Yarraville: Soil Remediation

Soil Remediation Project Remediating 150,000 meters of asbestos contaminated soilWe worked on a project in Yarraville, remediating 150,000 meters of asbestos contaminated soil. The project was a major undertaking, requiring careful planning and execution to ensure the...

Correctional Centre: Earthworks

Correctional Centre: Earthworks

Dame Phyliss Frost Correctional Centre Landscaping ProjectWe undertook a big earthworks project for the Dame Phyliss Frost Correctional Centre. The job included installation of a swale drain with rock beaching, fabric installation, soil stabilization with gypsum,...

GMA ASBESTOS

Asbestos Pipe Water Main Removal

Asbestos Pipe Water Main Removal

Sewerage Treatment Plant Asbestos Pipe RemovalDuring a pumping station upgrade, some asbestos pipework was uncovered whilst excavating. Not ideal. GMA were engaged to provide the immediate removal, transport and disposal of the asbestos pipework. The rapid response...

Asbestos Tile to Tin Roof

Asbestos Tile to Tin Roof

Tile to Tin Asbestos Tile RemovalWhen undertaking an asbestos tile roof strip on a residential property – time is of the essence. Mismanagement or delays can leave your property exposed to the elements, which can cause damage and excess costs. This is why GMA go the...

Boiler unit fully clad in Friable Asbestos

Boiler unit fully clad in Friable Asbestos

Villa Albert Museum Friable Asbestos RemovalThis boiler unit used to supply hot water to the historically listed Villa Albert Museum. Unfortunately it was also clad in friable asbestos.The Challenges The historical museum had a limited budget so GMA came up with an...

Asbestos Roof Strip & Reinstate

Asbestos Roof Strip & Reinstate

Asbestos Roof Strip & ReinstateAfter unsuccessfully using two contractors previously for roof replacement and having serious safety breaches, GMA was consulted on roof replacement.The Challenges The challenges were the height of the asbestos roof being replaced...

Emergency Asbestos Removal

Emergency Asbestos Removal

Storm Damage Emergency Asbestos RemovalA spring windstorm resulted in substantial damage to an asbestos roof at a brick manufacturing facility in Thomastown, Victoria. Upon notification, we promptly advised the client to evacuate all personnel from the affected area...

Contaminated Soil Removal

Contaminated Soil Removal

Western Water Asbestos Contaminated Soil RemovalDuring Jaydo’s construction of a new wastewater treatment plant for Western Water, redundant asbestos pipework and asbestos sheeting was found that had not been identified previously in soil samples or dial before you...

School Silica Dust Removal

School Silica Dust Removal

North FitzroyPrimary School Silica Dust RemovalNorth Fitzroy Primary School were concerned about dust that had accumulated in their loft space migrating into the classrooms below. The dust was tested and identified as silica with traces of heavy metal. Breathing in...

Asbestos Removal Due to Fire Damage

Asbestos Removal Due to Fire Damage

Oberon High School Asbestos Removal Due to Fire DamageThe North wing of Oberon Highschool was unfortunately gutted by a fire in 2021. To make matters worse, the fire damaged area also contained asbestos. Due to the extent of the damage, we needed to work closely with...

Fast Class A & Class B Removal

Fast Class A & Class B Removal

Ford Motor Co Fast Class A & B Asbestos RemovalThe ‘small parts’ paint kilns at the old Ford Motor Co Factory were 140 meters long and 5 meters high. Containing friable insulation duct work and non-friable paper gaskets, all of which needed to be removed in a...

Over 200m of Asbestos Pipe

Over 200m of Asbestos Pipe

Over 200m of Asbestos Pipe Asbestos RemovalWe were asked to remove 200 meters of asbestos pipe that was previously used as a main sewer line for the Underbank Estate in Bacchus Marsh. Prior to beginning the removal, we liaised with other contractors to ensure safe...

GMA PROPERTY

Peelmans Lane: Landscaping

Peelmans Lane: Landscaping

Peelmans Lane Landscaping ProjectGMA were engaged by Jaydo to install chainmesh fencing, barriers, Tuscan topping walkways, and a commercial irrigation system at a pumping station in Werribee. We were also asked to plant indigenous shrubs to screen off the new pumping...

Sydney Myer: Turf Preparation

Sydney Myer: Turf Preparation

Sydney Myer Music Bowl Turf Preparation GMA were called in at the last minute to prepare the turf area for the annual Carols by Candlelight. Our client had machinery problems, but with GMA’s personnel and equipment were able to mobilize quickly and get the grass...

Dunnstown Quarry: Landscaping

Dunnstown Quarry: Landscaping

Dunnstown Quarry Landscaping ProjectBoral’s flagship site in regional Victoria is their Dunnstown Quarry. Boral wanted to add a point of difference at the entrance to the weighbridge. GMA were engaged to come up with a design that showcased the boral exposed aggregate...

Project: Low Maintenance Garden

Project: Low Maintenance Garden

Visy Beverage Low Maintenance GardenVisy wanted a low maintenance outdoor garden for their premises at Clayton. They wanted to retain the existing large gum tree’s and reduce their monthly grounds maintenance costs. Visy being a packaging and resource recovery...

Defence Base: Landscaping

Defence Base: Landscaping

Department of Defense Landscaping ProjectLandscaping of verge and pathways at defence base in Port Melbourne. Works include working with stakeholders to ensure security requirements were met for trasdemen, deliverys and machinery. A tight timeline of two days was...

Lynbrook Station: Landscaping

Lynbrook Station: Landscaping

Lynbrook Station Landscaping ProjectWe were engaged to undertake the landscaping by Symal for the Lynbrook train station carpark upgrade. Works included raingarden construction, the planting of tube stock and mature trees, and mulching. We also drafted a 24-month...

Project:  Residential Landscaping

Project:  Residential Landscaping

1600 SQUARE METERS OF TURF Landscaping ProjectWe were approached by Kristy who asked us to help landscape her beautiful home in Bacchus Marsh. She was keen to transform the hilly location with instant turf.The Challenges Remove 160 square metres of soil and prepare...

Royal Womans: Line Marking

Royal Womans: Line Marking

Royal Womans Hospital Line MarkingThe loading dock at the Royal Women’s Hospital is shared with the Royal Melbourne Hospital. It takes deliveries throughout the day and night, also a waste packing station is operational during the day. GMA worked with major...

Ford Motors: Landscaping

Ford Motors: Landscaping

Ford Motors Landscaping ProjectAs part of Ford Motor’s $70 million dollar upgrade to it’s Broadmeadows facilitiy, they wanted to re-landscape the entrance to the head office.The Challenges The brief was simple, a mix of mulch and decorative toppings with native...

Project: Industrial Cleaning

Project: Industrial Cleaning

PGH Bricks & Pavers Industrial CleaningPigeon droppings are always a problem in old factory settings. We were approached by a client who needed help cleaning their factory storage area. They needed the space professionally cleaned to ensure the safety of everyone...

Moorabool Shire: Landscaping

Moorabool Shire: Landscaping

Moorabool Shire Landscaping ProjectGMA were successful in their bid to provide landscaping services to Rustel Constructions for the newly constructed entrance to the township of Bacchus Marsh.  The Challenges In terms of Moorabool Shire, the landscaping design...

Vegemite Factory: Outdoor Area

Vegemite Factory: Outdoor Area

Vegemite Factory Landscaping ProjectThe Vegemite factory had a large outdoor area what was centrally located but not being utilised as a useful outdoor space. Early discussions with key stakeholders showed the site wanted to create a dynamic space that could be used...

GOT A PROJECT IN MIND?

GET IN TOUCH TO DISCUSS