Bacchus Marsh Grammar
Greens Field
Feb - Jun 2026
Aintree, Victoria
Bacchus Marsh Grammar
Stage 1: Subgrade
Stage one of the project involved cutting the green fields down to design level in order to get the subgrade to the correct grade for drainage.
The equipment required for this stage included a GPS Grader, Excavator, Tip Truck, Posi Track, Water Truck, and a Smooth Drum Roller.
5 Days
1300m3 Dirt Removed
Contact
GMA Property
If you have a project in mind or just want to ask a question – get in touch!