Bacchus Marsh Grammar

Greens Field

Feb - Jun 2026

Aintree, Victoria

Bacchus Marsh Grammar

Stage 1: Subgrade

Stage one of the project involved cutting the green fields down to design level in order to get the subgrade to the correct grade for drainage.

The equipment required for this stage included a GPS Grader, Excavator, Tip Truck, Posi Track, Water Truck, and a Smooth Drum Roller.

}

5 Days

1300m3 Dirt Removed

Contact

GMA Property

If you have a project in mind or just want to ask a question – get in touch!

(03) 5367 0000

info@gmaust.com.au